-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Immediate download
- $417.00
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $417.00
- Add to Cart
Customers Who Bought This Also Bought
-
IEC 61116 Ed. 1.0 b:1992
Priced From $367.00 -
IEC/TR 61366-1 Ed. 1.0 en:1998
Priced From $367.00 -
IEC 62097 Ed. 2.0 b:2019
Priced From $430.00 -
IEC 62006 Ed. 1.0 b:2010
Priced From $455.00
About This Item
Full Description
- speed, power, water level, opening and flow (discharge) control for reaction and impulse-type turbines including double regulated machines;
- means of providing actuating energy;
- safety devices for emergency shutdown.
To facilitate the setting up of specifications, this guide also includes data sheets, which are to be filled out by the customer and the supplier in the various stages of the project and the contract. Acceptance tests, specific test procedures and guarantees are outside the scope of the guide; those topics are covered by IEC 60308. This second edition cancels and replaces the first edition published in 1998. It is a technical revision. It takes into account the experience with the guide during the last decade as well as the progress in the state of the art of the underlying technologies. Keywords: Hydraulic turbine, Hydraulic turbine governing systems.
Document History
-
IEC 61362 Ed. 2.0 b:2012
viewing
Guide to specification of hydraulic turbine governing systems- Most Recent
-
IEC 61362 Ed. 1.0 b CORR1:2000
Corrigendum 1 - Guide to specification of hydraulic turbine control systems- Historical Version
-
IEC 61362 Ed. 1.0 b:1998
Guide to specification of hydraulic turbine control systems- Historical Version