Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $24.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

In 2001, the Contra Costa Water District (District) created a new programmatic process to improve the District's steel water tanks after inspections identified significant corrosion and structural degradation in a number of tanks. The approach for implementation of this program has been to assess the long-term, overall condition and operational effectiveness of the tanks on a case-by-case basis but under an overall global view of the twelve steel tanks as a whole, with improvements prioritized based on the lowest life cycle cost-to-benefit required to bring these facilities to current industry standards. Includes tables, figures, appendix.