Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $27.25
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

The technical requirements in the present document reflect, in part, the results of studies undertaken within the CEPT on compatibility between broadband direct air-to-ground systems and other applications operating within, or adjacent to, the frequency bands which are designated for BDA2GC operations. These studies are described in ECC Report 209 [i.2] (for the 1 900 MHz to 1 920 MHz band) and ECC Report 210 [i.3] (for the 5 855 MHz to 5 875 MHz band).

The resulting technical and operational requirements to be applied to BDA2GC systems in the 1 900 MHz to 1 920 MHz bands and the 5 855 MHz to 5 875 MHz bands are contained within ECC Decision(15)02 [i.4] and ECC Decision(15)03 [i.5] respectively.