-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Immediate download
-
$52.00Members pay $27.00
- Add to Cart
Customers Who Bought This Also Bought
-
Seminar 04 -- Indoor Air Quality and Desiccants
Priced From $52.00 -
Seminar 76 -- Standard 205 HVAC Energy Simulation Standar...
Priced From $52.00 -
Seminar 23 -- The Road to Zero Energy Buildings Goes Thro...
Priced From $52.00 -
Seminar 25 -- Wire-to-Air Fan Power Performance and Energ...
Priced From $52.00
About This Item
Full Description
This product contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
Preparing equipment and assemblies for final check-out verification, start-up procedure and proper operation requires a coordinated activity of testing, adjusting, measurement and documentation that will ensure a successful result. This session describes how the commissioning process would be applied to achieve a successful chilled water plant operation needed to comply with the owner's project requirement and the design documents.
- Commissioning Chilled Water and Condenser Water Pumps
David Cohen, P.E., Member, Grumman/Butkus Associates, Evanston, IL
Run Time: 90 mins.