-
-
Available Formats
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Printed Edition
- Ships in 1-2 business days
- $730.00
- Add to Cart
Customers Who Bought This Also Bought
-
ASME BPVC.III.1.NB-2023
Priced From $705.00 -
ASME BPVC.III.5-2023
Priced From $740.00 -
ASME BPVC.XI.1-2023
Priced From $940.00 -
ASME BPVC.III.1.NG-2023
Priced From $625.00
About This Item
Full Description
Product Scope / Abstract
Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied.
DIVISION 2
This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.
View presentation of key changes to the 2021 BPVC (PDF)
Document History
-
ASME BPVC.XI.2-2023
2023 ASME Boiler and Pressure Vessel Code, Section XI: Rules for Inservice Inspection of Nuclear Reactor Facility Components - Division 2: Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities- Most Recent
-
ASME BPVC.XI.2-2021
viewing
2021 ASME Boiler and Pressure Vessel Code, Section XI.2: Rules for Inservice Inspection of Nuclear Power Plant Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants- Historical Version
-
ASME BPVC.XI.2-2019
2019 ASME Boiler and Pressure Vessel Code, Section XI.2: Rules for Inservice Inspection of Nuclear Power Plant Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants- Historical Version
-
ASME BPVC.XI-2017
2017 ASME Boiler and Pressure Vessel Code, Section XI: Rules for Inservice Inspection of Nuclear Power Plant Components- Historical Version
-
ASME BPVC-XI-2015
2015 ASME Boiler and Pressure Vessel Code, Section XI: Rules for Inservice Inspection of Nuclear Power Plant Components- Historical Version
-
ASME BPVC-XI-2013
2013 ASME Boiler and Pressure Vessel Code (BPVC), Section XI: Rules for Inservice Inspection of Nuclear Power Plant Components- Historical Version
-
ASME BPVC-XI-2010
2010 ASME Boiler and Pressure Vessel Code (BPVC), Section XI: Rules for Inservice Inspection of Nuclear Power Plant Components, Includes 2011 Addenda Reprint- Historical Version