Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $60.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This document specifies the essential requirements of stationary systems for production of brines for winter road maintenance and includes tests of these requirements. Installation boundary: chloride and water inlet to the saturator, brine outlet to the spreading machine. Within the scope are materials, brine storage and brine loading/unloading equipment also. Mobile systems for production of brines in situ are not content of this document. The following points are not covered by this document: - System and construction requirements; - Requirements according to national and European legislations.

 

Document History

  1. DANSK DSF/FPREN 17443


    Winter service equipment – Brine production systems – Requirements and test methods

    • Historical Version
  2. DANSK DS/EN 17443

    👀 currently
    viewing


    Winter service equipment – Brine production systems – Requirements and test methods

    • Most Recent