Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • PDF
    • 👥
    • Immediate download
    • $10.00
      Members pay $7.50
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $10.00
      Members pay $7.50
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $13.00
      Members pay $9.75
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

MIL-STD-2003B covers shipboard installation requirements for electrical cable, equipment, penetrations, cableways, and connectors. This standard consists of this general standard and five parts as follows: Part 1 (Cable) Preparation and end-sealing, entry to equipment and connectors, repair and splicing. Part 2 (Equipment) Equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power. Part 3 (Penetrations) Swage tubes, stuffing tubes, kickpipes, surface ships and submarines, hull penetration, and general. Part 4 (Cableways) General, submarine, surface ship and cable protection. Part 5 (Connectors) Cable and conductor preparation in accordance with MIL-C-81511, MIL-DTL-5015, MIL-DTL-26482, MIL-DTL-28840, MIL-DTL-22992, and MIL-DTL-38999 connectors.
 

Document History

  1. MIL MIL-STD-2003B

    👀 currently
    viewing


    Electric Plant Installation Standard Methods for Surface Ships and Submarines

    • Most Recent
  2. MIL MIL-STD-2003A


    Electric Plant Installation Standard Methods for Surface Ships and Submarines

    • Historical Version