-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Immediate download
- $250.00
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $250.00
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
- $391.00
- Add to Cart
Customers Who Bought This Also Bought
-
ISO 6412-1:2017
Priced From $81.00 -
ISO/TR 10465-3:2007
Priced From $250.00 -
ISO/TR 16913:1999
Priced From $54.00 -
ISO/TR 10465-2:2007
Priced From $223.00
About This Item
Full Description
This document specifies the steps of the overall process of pipeline rehabilitation, comprising:
— information on strategic and tactical activities:
a) investigation and condition assessment of the existing pipeline;
b) pipeline rehabilitation planning.
— information on and requirements for operational activities:
c) project specification;
d) applications of techniques;
e) documentation of the design and application process.
— new construction provided as network extensions;
— calculation methods to determine, for each viable technique, the characteristics of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline;
— techniques providing non-structural pressure pipe liners;
— techniques for local repair. It is the responsibility of the designer to choose and design the renovation or trenchless replacement pipeline system.
Document History
-
ISO 11295:2022
viewing
Plastics piping systems used for the rehabilitation of pipelines - Classification and overview of strategic, tactical and operational activities- Most Recent
-
ISO 11295:2017
Classification and information on design and applications of plastics piping systems used for renovation and replacement- Historical Version
-
ISO 11295:2010
Classification and information on design of plastics piping systems used for renovation- Historical Version
-
ISO/TR 11295:1992
Techniques for rehabilitation of pipeline systems by the use of plastics pipes and fittings- Historical Version