Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $24.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $24.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

Confusion is sometimes expressed over plant capital and operating costs, particularly where two plants of similar production capacity and design incur very different costs. These differences i costs are naturally attributed to site-specific factors. Site-specific factors that can have a dramatic effect on the actual capital and operating costs include: water source (groundwater or surface supply); concentrate disposal sites; local costs such as labor, chemicals, electricity, etc.; unit (train) size. The objective of this paper, then, is to examine how these factors affect the costs of building and operation such a facility. In order to determine how these various items influence the costs of a facility, two reference designs were prepared. one for a reverse osmosis plant and another for an electrodialysis reversal plant.