-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
- $474.98
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $474.98
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
- $641.35
- Add to Cart
Customers Who Bought This Also Bought
-
ISO 15709:2002
Priced From $81.00 -
ISO 16622:2002
Priced From $166.00 -
ISO/IEC 17025:2017
Priced From $162.00 -
ISO 3966:2020
Priced From $250.00
About This Item
Full Description
The wind turbine power performance characteristics are determined by the measured power curve and the estimated annual energy production (AEP). The measured power curve, defined as the relationship between the wind speed and the wind turbine power output, is determined by collecting simultaneous measurements of meteorological variables (including wind speed), as well as wind turbine signals (including power output) at the test site for a period that is long enough to establish a statistically significant database over a range of wind speeds and under varying wind and atmospheric conditions. The AEP is calculated by applying the measured power curve to reference wind speed frequency distributions, assuming 100 % availability.
This document describes a measurement methodology that requires the measured power curve and derived energy production figures to be supplemented by an assessment of uncertainty sources and their combined effects.
Cross References:
IEC 61869-2:2012 ED1
IEC 60688:2012
IEC 61869-3:2011 Ed 1
ISO 3966:2008
EN 60688 (IEC 60688:2012) AS
EN ISO/IEC 17025 (ISO/IEC 17025:2005) AS
IEC 61869-1:2007 Ed 1
ISO/IEC 17043:2010 Ed 1
IEC 61400-12-2:2013
EN 61869-2:2012
EN 61869-1 (IEC 61869-1:2007) AS
EN 61400-12-2 (IEC 61400-12-2:2013) AS
ISO/IEC 17025:2005 Ed 1
EN ISO/IEC 17043(ISO/IEC 17034:2010)AS
EN 61869-3 (IEC 61869-3:2011) AS
ISO/IEC GUIDE 98-3:2008 Ed 1
ISO 2533 JCGM 200:2012
VDI/VDE 2648
IEC 61400-1:2005
IEC 61400-2:2013
ISO 16622:2002 Ed 1
EN 61400-12-2 (IEC 61400-12-2:2013) AS
IEC 61400-1:2005/AMD1:2010
IEC 61400-12-2:2013
EN 61400-1 Amd 1 (11/10) IEC AS
EN 61400-1 (IEC 61400-1:2005) AS
EN 61400-2 (IEC 61400-2:2013) AS
All current amendments available at time of purchase are included with the purchase of this document.
Document History
-
BS EN IEC 61400-12-6:2022
Wind energy generation systems-Measurement based nacelle transfer function of electricity producing wind turbines- Most Recent
-
BS EN IEC 61400-12-1:2017
Wind energy generation systems-Power performance measurement of electricity producing wind turbines- Historical Version
-
BS EN 61400-12-1:2017
viewing
Wind energy generation systems-Power performance measurement of electricity producing wind turbines- Historical Version
-
BS EN IEC 61400-12-2:2013
Wind turbines-Power performance of electricity-producing wind turbines based on nacelle anemometry- Historical Version
-
BS EN 61400-27-1:2015
Wind turbines-Electrical simulation models. Wind turbines- Historical Version
-
BS EN 61400-23:2014
Wind turbines-Full-scale structural testing of rotor blades- Historical Version
-
BS EN 61400-12-2:2013
Wind turbines-Power performance of electricity-producing wind turbines based on nacelle anemometry- Historical Version
-
BS EN 61400-4:2013
Wind turbines-Design requirements for wind turbine gea- Historical Version
-
BS 11/30256746 DC
BS EN 61400-23. Wind turbines. Part 23. Full-scale structural testing of rotor blades- Historical Version
-
BS 11/30210938 DC
BS EN 61400-4. Wind turbines. Part 4. Design requirements for wind turbine gearboxes- Historical Version
-
BS EN 61400-25-4:2008
Wind turbines-Communications for monitoring and control of wind power plants. Mapping to communication profile- Historical Version
-
BS ISO 81400-4:2005
Wind turbines-Design and specification of gearboxes- Historical Version
-
BS EN 61400-25-1:2007
Wind turbines-Communications for monitoring and control of wind power plants. Overall description of principles and models- Historical Version
-
BS EN 61400-25-3:2007
Wind turbines-Communications for monitoring and control of wind power plants. Information exchange models- Historical Version
-
BS EN 61400-25-5:2007
Wind turbines-Communications for monitoring and control of wind power plants. Conformance testing- Historical Version
-
BS EN 61400-12-1:2006
Wind turbines-Power performance measurements of electricity producing wind turbines- Historical Version
-
BS 05/30137813 DC
IEC 61400-25-5 ED 1. Wind turbines. Part 25-5. Communications for monitoring and control of wind power plants. Conformance testing- Historical Version
-
BS 04/30126296 DC
ISO 81400-4. Wind turbine generator systems. Part 4. Gearboxes for turbines from 40 kW to 2 MW and larger- Historical Version
-
BS DD IEC/TS 61400-23:2002
Wind turbine generator systems-Full-scale structural testing of rotor blades- Historical Version
-
BS EN 61400-12:1998
Wind turbine generator systems-Wind turbine power performance testing- Historical Version