Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

The purpose of this retrofit project was to replace the existing central steam boiler plant serving a 6 by 10 million ft2 (557 by 10 000 m2) semiconductor manufacturing complex in Dallas. Building code compliance and expansion of water-chilling capacity at the central utility plant required relocating the existing steam boilers into a separate room, but the age and condition of the existing steam boilers warranted their replacement. As a result, a modernization project was undertaken to construct a separate boiler room and install new, high-efficiency, low-emission replacement steam boilers.