Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

When the HVAC design of the Hamilton Landing project was first conceived in 1998, it consisted of large package air-cooled rooftop units sitting next to the historic hangars with a conventional overhead VAV reheat system.