Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
 

About This Item

 

Full Description

Environmental issues were seriously addressed when a new building was designed with district heating and cooling for the Osaka gas company. As a result, the building was officially recognized as "Environmentally Conscious Building No. 1" by the Construction Ministry. In order to reduce cost by peak shaving, adoption of a floor thermal storage system was planned. This paper describes results regarding the peak shaving by floor thermal storage system in designing the air-conditioning system.

Units: Dual