Language:
    • Available Formats
    •  
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $78.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

ENGLISH HISTORICAL VERSION

Purpose. This standard provides a thorough procedure to help develop a robust and stable injection molding process that has minimal variation and produces a high quality plastic part. The goal is to produce a part that meets the GM10067 Part Submission Requirements for the Matching 1 event and also establish the ground work to meet future appearance and dimensional requirements. Additionally, it is important to develop a stable universal injection molding process that can be transferred from the tryout press to the supplier's press with minimal effect on part characteristics. This standard works in conjunction with the manufacturing requirements of Appendix E8 given in the Statement of Requirements (SOR) during the sourcing of injection molded parts, and with the GMW16355 Thermoplastic Injection Mold Analysis. Any deviations to this standard must be agreed upon by General Motors Engineering, which will be the Manufacturing Polymer Engineer or the GM Product Engineer if Polymer resources are not assigned to the part.

Applicability. This specification applies to the required injection mold T1 (GM first shot) tryouts during the plastic part development phase leading up to the Matching 1 event.

 

Document History

  1. GMW GMW16365


    Thermoplastic Injection Mold T1 Tryout Protocol

    • Most Recent
  2. GMW GMW16365

    👀 currently
    viewing


    Thermoplastic Injection Mold T1 Tryout Protocol

    • Historical Version
  3. GMW GMW16365


    Thermoplastic Injection Mold T1 Tryout Protocol

    • Historical Version