Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $156.00
    • Add to Cart
    • Softcover
    • Ships in 3-5 business days
    • $156.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This code applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2021 IBC® contains many important changes such as:
  • Puzzle rooms (escape rooms) are now defined and regulated as special amusement areas, requiring compliance with Section 411 and special means of egress requirements.
  • For the purposes of determining the allowable number of control areas in a building, each portion separated by one or more fire walls is now considered as a separate building.
  • In Group E occupancies, enhanced classroom acoustics in compliance with ICC A117.1 are to be provided in all classrooms having of volume of 20,000 cubic feet or less.
  • The requirements for metal composite materials and systems (MCM) installed on the exterior walls of Types I, II, III and IV construction were simplified and sprinkler allowances were deleted
  • The use of intermodal shipping containers as buildings is now specifically addressed through provisions intended to supplement existing applicable IBC requirements.
  • Automatic sprinkler protection is now required in Group S-2 open parking garages where any fire area exceeds 48,000 square feet.
  • The 2017 edition of ICC A117.1 was adopted.
  • Parapets of a minimum height are now required for aggregate-surfaced roofs to prevent blow-off.
  • Mixed occupancy buildings with assembly spaces are placed in Risk Category III when the total public assembly occupant load is greater than 2500 people.
  • The 2021 IBC snow map is updated to match ASCE 7-16 snow maps by adding a reference to ASCE 7 snow tables in states with large case study areas.
  • Secondary rain loads are updated to be consistent with ASCE 7.
  • Special inspection requirements were added to address the anchorage and connection of mass timber structural elements.
  • Installation of firestop, fire-resistant joint systems and perimeter fire barrier systems in residential-use buildings now requires special inspection in Group R fire areas having an occupant load exceeding 250 people.
  • Frost protection for egress doors was added to the foundation requirements.
  • ACI standards ACI 117 and ITG 7 were added by reference to provide acceptable tolerances for concrete construction.
  • Three new types of construction (Types IV-A, IV-B, and IV-C) allow mass timber buildings of taller heights, more stories above grade, and greater allowable areas compared to existing provisions for heavy timber buildings.
 

Document History

  1. ICC IBC-2024


    2024 International Building Code

    • Most Recent
  2. ICC IBC-2021

    👀 currently
    viewing


    2021 International Building Code

    • Historical Version
  3. ICC IBC-2018


    2018 International Building Code

    • Historical Version
  4. ICC IBC-2015


    2015 International Building Code

    • Historical Version
  5. ICC IBC-2012


    2012 International Building Code

    • Historical Version
  6. ICC NY-BC-2010


    Building Code of New York State, 2010

    • Historical Version
  7. ICC IBC-2009


    2009 International Building Code

    • Historical Version
  8. ICC NY-BC-2007


    Building Code of New York State, 2007

    • Historical Version
  9. ICC IBC-2006


    2006 International Building Code

    • Historical Version
  10. ICC IBC-2003


    2003 International Building Code

    • Historical Version
  11. ICC IBC-2000


    International Building Code

    • Historical Version