Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $734.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

IEC 61850-7-410:2012+A1:2015 specifies the additional common data classes, logical nodes and data objects required for the use of IEC 61850 in a hydropower plant. The main changes with respect to the previous edition are as follows:
- the logical nodes in IEC 61850-7-410:2007 that were not specific to hydropower plants have been transferred to IEC 61850-7-4:2010;
- the definitions of logical nodes in this edition of IEC 61850-7-410 have been updated;
- most of the modelling examples and background information included in IEC 61850-7-410:2007 have been transferred to IEC/TR 61850-7-510.
This new edition of IEC 61850-7-410 includes additional general-purpose logical nodes that were not included in IEC 61850-7-4:2010, but are required in order to represent the complete control and monitoring system of a hydropower plant. This consolidated version consists of the second edition (2012) and its amendment 1 (2015). Therefore, no need to order amendment in addition to this publication.
 

Document History

  1. IEC 61850-7-410 Ed. 2.1 b:2015

    👀 currently
    viewing


    Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control CONSOLIDATED EDITION

    • Most Recent
  2. IEC 61850-7-410 Ed. 2.0 b:2012


    Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control

    • Historical Version
  3. IEC 61850-7-410 Ed. 1.0 en:2007


    Communication networks and systems for power utility automation - Part 7-410: Hydroelectric power plants - Communication for monitoring and control

    • Historical Version