-
-
Available Formats
- Options
- Availability
- Priced From ( in USD )
-
Available Formats
-
- Secure PDF 🔒
- Immediate download
- $398.78
- Add to Cart
-
- Printed Edition
- Ships in 1-2 business days
- $398.78
- Add to Cart
-
- Printed Edition + PDF
- Immediate download
- $538.48
- Add to Cart
Customers Who Bought This Also Bought
-
BS EN ISO 10414-2:2011
Priced From $398.78 -
BS EN ISO 6807:2003
Priced From $190.50 -
BS EN ISO 28781:2010
Priced From $368.30 -
BS EN ISO 19901-1:2015
Priced From $398.78
About This Item
Full Description
This document is applicable to any well, or group of wells, regardless of their age, location (including onshore, subsea and offshore wells) or type (e.g. naturally flowing, artificial lift, injection wells).
This document is intended to assist the petroleum and natural gas industry to effectively manage well integrity during the well life cycle by providing:
- minimum requirements to ensure management of well integrity; and
- recommendations and techniques that well operators can apply in a scalable manner based on a well's specific risk characteristics.
This document addresses each stage of the well life cycle, as defined by the six phases in a) to f), and describes the deliverables between each phase within a Well Integrity Management system.
- a) The "Basis of Design Phase" identifies the probable safety and environmental exposure to surface and subsurface hazards and risks that can be encountered during the well life cycle. Once identified, these hazards and risks are assessed such that control methods of design and operation can be developed in subsequent phases of the well life cycle.
- b) The "Design Phase" identifies the controls that are to be incorporated into the well design, such that appropriate barriers can be established to manage the identified safety and environmental hazards. The design addresses the expected, or forecasted, changes during the well life cycle and ensures that the required barriers in the well?s design are based on risk exposure to people and the environment.
- c) The "Construction Phase" defines the required or recommended elements to be constructed (including rework/repair) and verification tasks to be performed in order to achieve the intended design. It addresses any variations from the design which require a revalidation against the identified hazards and risks.
- d) The "Operational Phase" defines the requirements or recommendations and methods for managing well integrity during operation.
- e) The "Intervention Phase" (including work-over) defines the minimum requirements or recommendations for assessing well barriers prior to, and after, any well intervention that involves breaking the established well barrier containment system.
- f) The "Abandonment Phase" defines the requirements or recommendations for permanently abandoning a well.
Cross References:
ISO/TR 10400
ISO 10417
ISO 10418
ISO 13628-1
ISO 13703
ISO 14224
ISO 14310
ISO 17776
ISO 31000
IEC 31010
API 6AV2
API/TR 10TR1
API RP 14B
API RP 14C
API RP 14E
API RP 90
DNV RP 0501
2013/30/EU
NACE/SP 0169
NORSOK/SP 001
NORSOK D-010
OGP 415
OGP 456
ISO/TS 17969
All current amendments available at time of purchase are included with the purchase of this document.