Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Secure PDF 🔒
    • 👥
    • Immediate download
    • $192.00
    • Add to Cart
    • Printed Edition
    • Ships in 1-2 business days
    • $192.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $325.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This Recommended Practice (RP) addresses coiled tubing well control equipment assembly and operation as it relates to well control practices. Industry practices for performing well control operations using fluids for hydrostatic pressure balance are not addressed in this RP.

This document covers well control equipment assembly and operations used in coiled tubing intervention and coiled tubing drilling/milling applications performed through:
  • tree equipment constructed in accordance with API 6A or API 11IW or both,
  • a surface flow head or surface test tree constructed in accordance with API 6A,
  • a fracture stimulation wellhead assembly (with at least two gate valves installed for isolation),
  • drill pipe or workstrings with connections manufactured in accordance with API 5CT, API 5DP or API 7-1, or a combination thereof.
 

Document History

  1. API RP 16ST

    👀 currently
    viewing


    Coiled Tubing Well Control Equipment Systems, Second Edition, Includes Addendum 1 (2022)

    • Most Recent
  2. API RP 16ST (R2014)


    Coiled Tubing Well Control Equipment Systems, First Edition

    • Historical Version
 

Amendments, rulings, supplements, and errata

  1. API RP 16ST Addendum 1

    Free
    Download


    Addendum 1 (2022) to Coiled Tubing Well Control Equipment Systems, Second Edition, Includes