Language:
    • Available Formats
    • Options
    • Availability
    • Priced From ( in USD )
    • Printed Edition
    • Ships in 1-2 business days
    • $150.00
    • Add to Cart
    • Printed Edition + PDF
    • Immediate download
    • $203.00
    • Add to Cart

Customers Who Bought This Also Bought

 

About This Item

 

Full Description

This Practice provides requirements for quality control and quality assurance for the installation of monolithic refractory lining materials. The test and inspection methods include installer prequalification, production sample testing, in-progress installation inspection, and final inspection of the completed lining.
 

Document History

  1. PIP RFTM1000

    👀 currently
    viewing


    Monolithic Refractory Installation Qualification, Inspection, and Testing [Complete Revision]

    • Most Recent
  2. PIP RFTM1000


    Monolithic Refractory Installation Qualification, Inspection, and Testing [Editorial Revision]

    • Historical Version
  3. PIP RFTM1000


    Monolithic Refractory Installation Qualification, Inspection, and Testing [Complete Revision]

    • Historical Version
  4. PIP RFTM1000


    Qualification, Inspection, and Testing of Monolithic Refractory Installations

    • Historical Version